内页默认横幅
NANHUA Communication System Shipment for ZPMC RTG Retrofit Project in Turkish Terminal CompletedMay11, 2026

Overview

We are pleased to announce that the full set of NANHUA communication equipment for the ZPMC Rubber Tyred Gantry (RTG) crane retrofit project at a Turkish port terminal was successfully dispatched on May 11, 2026. This shipment marks a key milestone in the terminal's automation upgrade initiative, delivering robust, industrial-grade communication solutions tailored for port operation scenarios.

Shipment Details

The consignment includes a complete set of terminal communication and public address equipment, with the following manifest:


S/N      Product Description               Quantity

1           DT301 Indoor Station                       2    

2           DT302 Outdoor Station                   6    

3           DT303 Operator Station                  2    

4           DT304 Power control box                2    

5           PAPG2410                                         2    

6           PAPG2425                                         2    

7           PAPG2520 Pedal Switch                   2    

8           PAPG2510                                          2    

Total     Total units                                       20    

The equipment lineup covers core communication components including industrial telephones, high-power loudspeakers, operator audio control stations, foot pedal switches and microphones, designed to deliver reliable, low-latency voice communication and public address capabilities for port RTG operation scenarios, even in harsh outdoor working environments.

Project Background

This shipment supports the full-system retrofit of ZPMC RTG cranes at the Turkish terminal, aiming to upgrade the cranes' on-board communication system to meet modern port automation operation requirements. The NANHUA communication system will enable stable voice interaction between RTG operators, ground personnel, and terminal control centers, effectively improving operation efficiency and safety management level at the terminal.

All equipment has passed strict factory testing and quality verification before shipment, and is expected to arrive at the project site within the scheduled logistics cycle, followed by on-site installation, commissioning and operation.

Gallery


Equipment Display                                                                                                   Packaged Shipment


NANHUA industrial communication equipment before packaging    Fully packaged shipment ready for dispatch    


For inquiries about this project or our port communication solutions, please contact our sales team via the official website contact channel.


If you need to adjust the content structure, add company introduction or project background details, or modify the tone to match your website style, you can tell me your specific requirements at any time.





Contact Us

Shanghai GeRunWan Technology Co., Ltd. is a high-tech enterprise specializing in the supply of spare parts and equipment refurbishment and overhaul projects for port machinery. 

click here to leave a message

Leave A Message

If you are interested in spare parts of port machinery and would like to get a price, please leave a message here, we will reply you as soon as we can.

Submit

Home

Products

About us

Contact us